Working with Jones Lang LaSalle, UBW was engaged to provide custom safety barriers along the water’s edge of the entire Sydney Superyacht Marina in Rozelle. The barriers cover approximately 380m of waterfront.
Our Approach
Designed, fabricated and installed by UBW.
UBW managed the full delivery, from design approval through fabrication to installation. The 20 week programme covered all three stages, ending with installation of the barriers along the marina’s full waterfront.
Project Gallery
The Project in Pictures.
Scope of Works
Design of custom safety barriers
Design approval
Fabrication of safety barriers
Installation along the marina water’s edge (approx 380m)